{"id":3131,"date":"2020-05-04T10:30:13","date_gmt":"2020-05-04T08:30:13","guid":{"rendered":"https:\/\/www.soletanchefreyssinet.com\/?p=3131"},"modified":"2020-09-08T17:39:09","modified_gmt":"2020-09-08T15:39:09","slug":"underground-cut-off-wall-for-boone-dam-tennessee-united-states","status":"publish","type":"post","link":"https:\/\/www.soletanchefreyssinet.com\/en\/2020\/05\/04\/underground-cut-off-wall-for-boone-dam-tennessee-united-states\/","title":{"rendered":"Underground cut-off wall for Boone Dam (Tennessee, United States)"},"content":{"rendered":"
Nicholson Construction<\/a>, a subsidiary of Soletanche Bachy Soletanche Bachy<\/a> in the United States, is building a large underground cut-off wall at Boone Dam (255 m long, 50 m deep), involving drilling into very hard rock. This project is the final major stage in the construction of a composite seepage barrier that is designed to stop internal erosion of the dam\u2019s earthen embankment.<\/p>\n<\/div> Works: Soletanche Bachy is building an underground cut-off wall to stop internal erosion of a dam’s earthen embankment.<\/p>\n","protected":false},"author":1,"featured_media":3133,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[170,90,132,150,182],"tags":[],"class_list":["post-3131","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-accesspower-en","category-dam","category-soletanche-bachy-en","category-united-states","category-works"],"acf":[],"yoast_head":"\n